Since the date of establishement, IDS-Nepal has completed 110 Projects in different sectors.

These Project Includes:  

Implementation Phase Batch X Detailed Activities: Program Implemented in Sagardina Water Supply Project; Materiya Water Supply and Sanitation Project; Matiariya Water Supply and Sanitation Project and Rambasti Water Supply and Sanitation Project Beneficiaries are Sagardina Water Supply Project: Total HHs 159; Total Pop. 921 (M 473, F 456); Poor HHs 18 (Pop. 117) Materiya WSSP: Total HHs 171; Total Pop. 943 (M 495, F 448); Poor HHs 146 (Pop. 801) Matiariya WSSP: Total HHs 163; Total Pop. 875 (M 476, F 399); Poor HHs 59 (Pop. 293) Rambasti WSSP: Total HHs 155; Total Pop. 891(M 471, F 420); Poor HHs 72 (Pop. 412) WSS schemes constructing as per design estimates Overhead tank construction and tube well construction Operation and Maintenance (O&M) Fund regular collection…
Implement and Prepare WASH in Schools Profile Report of Mid and Far Western Public Schools Detailed Activities: Prepare detail WASH status of public schools of mid and far western regions (Rukum East and West, Jajarkot, Dailekh, Bajura, Darchula, Baitadi, Dadeldhura, Doti and Achham) Consultation meeting with concern stakeholders Sharing and finalizing questionnaire with WFP, DoE and WASH experts for finalizing questionnaire Sharing final questionnaire with WFP and DoE in both Nepali and English Print the finalize questionnaire from the printing press Orientation to enumerators about the survey form Collect, process and analyse the status of WASH related knowledge and practice among students and WASH facilities in all public schools Identify WASH related knowledge, practice and infrastructure gaps in the region Compile and prepare standard status report of WASH in schools
Post Open Defecation Free (ODF) Support in GSF supported ODF Districts in Bardiya Detailed Activities: Compliment total sanitation activities in 6 VDCsPatabhar, Pashupatinagar, Manau, Sorahawa, Mainapokhar and Jamuni (New Restructure Geruwa Rural Municipality and Badaiyatal Rural Municipality) of Bardiya district consisting 12,171 HHs with 62,372 Population (Male: 29,080 and Female: 33,292) Sector Coordination and Planning workshop on total sanitation promotion program VDC level post ODF/TSSP plan of Action formulation workshop Capacity building orientation training on total sanitation guideline for VDC secretaries and Secretaries of Rural Municipality 54 events of 2 days ward level total sanitation orientation including all cross cutting issues Base line survey of 6 VDCs Advocacy, awareness and demonstration and visibility through electronic and print media Develop sanitation model community 2 in each VDC comprising 50 HHs in average Conduct triggering…
Community based Flood and Glacial Lake Outburst Risk Reduction Project (CFGORRP) Detailed Activities: To prepare Gender sensitive and inclusive village level disaster risk management plan (VDRMP) for Sarpallo and Nainhi VDCs of Mahottari district Systematic collection, review and analysis of available documents Collecting socio-economic information and livelihood assets Participatory and consultative meeting Collect baseline information and mapping Need assessment Facilitate local vulnerable communities to get approval of the VDRMP from respective VDC and DDC
Development Phase Batch X i. Sagardina Water Supply Project ii. Materiya Water Supply and Sanitation Project iii. Matiariya Water Supply and Sanitation Project iv. Rambasti Water Supply and Sanitation Project Detail Activities: Reservoir size: 30 cum per schemes Pipes length (Transmission + Distribution): 20 + 2300 m and Tap stands 28 in Sagardina WSSP Pipes length (Transmission + Distribution): 20 + 1900 m and Tap stands 24 in Materiya WSSP Pipes length (Transmission + Distribution): 20 + 1800 m and Tap stands 22 in Matiariya WSSP Pipes length (Transmission + Distribution): 20 + 2000 m and Tap stands 19 in Rambasti WSSP Program implemented in VDC Bhodaha 2, 3 & 7; Inarwasira 2  and Prastoka 4 of Bara District Total Number of training: 43 One toilet per household in project area Beneficiaries are Sagardina Water Supply Project: Total HHs 159; Total Pop. 921 (M 473, F 456); Poor HHs 18…
Methods Toolbox for Assessing Loss and Damage at Local Level Detailed Activities: The main objectives of this project are to design a methods toolbox that should become a prototype for future assessments of loss and damage by researchers and organization across the world and particularly in the Asia- Pacific Region. Following are the major activities: Implement the loss and damage tool kit, capturing data trough household survey data, participatory research tool etc In selected site under the project Dissemination of the project learning and case studies within Nepal and beyond through using organizational networks
Improving Knowledge, Attitudes and Practices for Water, Sanitation and Hygiene (WASH) under the School Meals Programme (SMP) Phase I Detail Activities: Compliment SMP with WASH activities in 968 schools of Rukum, Jajarkot, Dailekh, Bajura, Bajhang and Darchula benefitting 182,408 direct beneficiaries (95,288 students, 14,520 S-WASH-CC members, 72,600 teachers/parents/community members) and 912,040 indirect beneficiaries through following activities. 6 Kick up workshops S-WASH-CC establishment/formation/reformation-968 968 Child Club establishment/formation/reformation 120 Training for HMs/SMCs/PTAs etc Daily handwashing in 968 School 1 Social Mobilizer Training IEC Material Distribution in 968 Schools Sanitation Events Celebration in 968 Schools, Flex Printing/Hoarding Board in 968 Schools 6 Model School Establishment and  Water Quality Testing of 968 samples/schools
Improving Knowledge, Attitudes and Practices for Water, Sanitation and Hygiene (WASH) under the School Meals Programme (SMP) Phase II Detailed Activities: Compliment SMP with WASH activities in 968 Schools of Rukum, Jajarkot, Dailekh, Bajura, Bajhang and Darchula benefitting 203,088 direct beneficiaries (106,112 students, 14,520 S-WASH-CC members, 72,600 teachers/parents/community members; Individual trained 6,776, VDC level Orientation 3,080) and 823,176 indirect beneficiaries. District level planning and sharing meeting/ workshop SWASHCC mobilization and activation in 968 schools District level joint monitoring Strengthen, Orient and Mobilize School Child Clubs 194 Training events for HMs/ SMCs/ PTAs 120 Tippy Tap Construction in Schools Sanitation Kits Establishment and Management Daily Handwashing Practices One Social Mobilizer Refresher Training IEC material distribution and translation 6 Model school establishment Support to existing WASH model school Installation of 12 Improved Cooking Stoves in schools only in Dailekh district
Rehabilitation and Reconstruction (R&R) Program After Earthquake Detailed Activities: Community mass meeting to inform about R&R Health, Hygiene and Sanitation Program Sanitation activities for ODF Guide and assist the community to rebuild the scheme Conduct different training program and sanitation activities Detail Survey and Design Rehabilitation/construction of WSS schemes
Fellow-Up Open Defecation Free Campaign in Bara District Detailed Activities: Sector Coordination and Planning Support and facilitate D/V-WASH-CC and HHs to construct approximately 7,000 toilets Capacity Development for Behavioural Change, Communication and Monitoring ODF Campaign: Achievement of ODF status of remaining 12 VDCs out of 15 working VDCs Establish post ODF mechanism in at least 3 ODF VDCs At least 90% of people living in 30 GSF supported VDCs Hand Washing Practices
ODF and Post ODF Sanitation Campaign in Bara Detailed Activities: Working area Bhodaha, Inarwasira and Prastoka VDC  of Bara District Collection of ODF Baseline Information Sanitation Activities for ODF Support/facilitate/ initiate for construction of latrines School WASH Program Training on preparation of VDC level sanitation action plan for ODF/post ODF activities to VWASHCC in 3 VDC Training on ODF/Post ODF activities to school teachers, parents and students group members in 3 VDC Training on ODF/Post ODF activities to political parties, media, health and sanitation actor, child club, women group, sanitation focal person from each ward Training on total sanitation campaign/activities to VWASHCC member, sanitation focal person from each VDC ward
Service Organization (SO) for Implementation of WSS scheme in Khungri VDC Ward No. 2,3, and 5 , Rolpa District Detail Activities: Program implemented in Khungri Scheme Khungri VDC Beneficiaries are: Khungri VDC # 3 (Dhanachaur): Total 48 HH/ Popn. 322   (Male: 157; Female:165; Dalit: 9/51; Indigenous:2/16 and others: 37/255) WSS schemes constructing as per design estimates Operation and Maintenance (O&M) Fund regular collection Sanitation Revolving Loan Fund (SRLF) Mobilization Women Technical Support Services (WTSS) Strengthening School Health Promotion conduction Facilitate for the implementation of income generation activities Monitoring and supervision of infrastructure construction works.
Service Organization (SO) for Rural Water Supply and Sanitation Fund Development Board for Dhanachaur, Upper Gumchal, Khadkatole, Kunjari and Jedwang/ BakareKhola Schemes for Implementation phase (Batch-IX) in Rolpa District Detail Activities: Program implemented in 4 Schemes in 3 VDCs i.e. Jedwang, Sirpa, and Gumchal Beneficiaries are: Jedwang VDC # 3 (Jedwang): Total HH 52/ Popn. 327 (Male:166; Female:216; Dalit: 15 /102; Indigenous:0 and others: 37/280) 2.     Gumchal VDC #1 & 2 (Gumchal): Total 81 HH (Male: 231; Female:294; Dalit: 4/32; Indigenous:0 and others: 77/493) 3.     Sirpa VDC # 9 (Kunjeri) : Total 99 HH/ Popn. 603  (Male: 308; Female:295; Dalit: 11/73; Indigenous:0 and others: 88/530) 4.     Sirpa VDC # 6 (Khadgatol): Total 126 HH/ Popn. 744   (Male: 379; Female:365; Dalit: 15/846; Indigenous:0 and others: 111/660) WSS schemes constructing as per design estimates Operation and Maintenance (O&M) Fund regular collection Sanitation Revolving Loan Fund (SRLF) Mobilization Women Technical Support Services…
Open Defection Free campaign in Bara District (ODF - Bara) SGL- 33 Detail Activities: The Project aims to support the Bara district towards ODF campaign targeting 15 VDCs in this phase. Following are the major Specific Results expected. Sector Coordination and Planning. School Level Capacity Development for Triggering Behavioural Change, Communication and Monitoring ODF Campaign targeting  in 15 VDCs in this phase
Implementation of Multi Stakeholder Forestry Programme (MSFP) MSFP is currently working in 5 districts and aims to increase economic growth to improve livelihoods while improving forest management and addressing climate change.
Support for address vulnerable communities from flood & smoke pollution in Accham District Main activities of this project are to support for address vulnerable communities from flood & smoke pollution in Accham District.
Greenery Promotion and Established Ecosystem based Adaptation in Kalikot District The main objective of this project is to (1) increase greenery in Kalikot headquarter and surrounding areas and (2) pilot ecosystem based adaptation to reduce climate vulnerability of people.
Relief Efforts in Nepal The project aims to support for victimized people of the massive earthquake in Nepal.
Open Defecation Free (ODF) Campaign and Sanitation and Hygiene Behavioural Promotion in Bardiya District SGL-19
Open Defecation Free (ODF) Campaign and Sanitation and Hygiene Behavioural Promotion in Bardiya District SGL-19 Bardiya district is involved in this project with the aim to improve sanitation facilities and practice through community education and mobilization.
Support to the 2015 Earthquake Victims of Gorkha, Bhaktapur, Sindhupalchok and Gorkha Districts of Nepal IDS Nepal's relief work is supported by All India Disaster Mitigation Institute (AIDMI) through a new agreement "Support to the 2015 Earthquake Victims of Bhaktapur and Gorkha Districts of Nepal". The objectives of the program is to access and provide instant relief support for earthquake victims of gorkha and bhaktapur districts for approx. 1000  households; and to develop concepts for exploring the possibilities of long term support for the rehabilitation of the affected area. The first phase of providing instant relief package (shelter, dry foods, and basic medical kit) will form a ground for rapid assessment of the area, socio-economic conditions, loss and damage status and specific needs of the targeted area. This will help in designing contextual temporary shelter…